Search Results
Keyword:Core
Terra Clean Energy Receives Exploration Permit for Marysvale Uranium Project in Utah, USA
Terra Clean Energy Corp. recently announced that it has received the relevant permit from the Utah Division of Oil, Gas and Mining under the Utah Department of Natural Resources to carry out planned exploration work at its wholly-owned Marysvale Uranium Project. Under the approved work plan, the company will construct 5 drill pads to support subsequent diamond core drilling, and excavate 7 exploration trenches to expose and evaluate known uranium-bearing outcrops. Terra stated that this permit represents a significant milestone in advancing this historic uranium project. The trenching work will help the company's technical team map mineralized structures, collect samples, and validate existing geological interpretations. The results will...
2026-08-18
St. Lucie Nuclear Power Plant Unit 1 Returns to Full Power After Control Rods Unexpectedly Dropped into Reactor Core
Florida Power & Light (FPL) stated that St. Lucie Nuclear Power Plant Unit 1 has returned to 100% generating capacity after being manually shut down last week due to equipment issues. The unit was manually shut down by operators on Wednesday to facilitate inspections and repairs. According to information from the U.S. Nuclear Regulatory Commission (NRC), the incident was caused by three control rods dropping into the reactor core. FPL stated that the event posed no threat to the public or plant employees and caused no customer power outages. The cause of the equipment malfunction remains under investigation. St. Lucie Nuclear Power Plant is located near St. Lucie County, Florida. Forrest Brandon, a local resident living along the Indian River Lagoon with a view of the plant buildings...
2026-08-18
What "Hardcore" Technologies Lie Behind the Nuclear Power Plants Inspected by the Minister of Ecology and Environment?
From August 14 to 15, Huang Runqiu, Minister of Ecology and Environment, conducted a research tour on ecological and environmental protection work in Lishui, Taizhou, and Ningbo cities of Zhejiang Province. Actively, safely, and orderly developing nuclear power is an important measure for building a clean, low-carbon, safe, and efficient energy system and for achieving carbon peak and carbon neutrality. Huang Runqiu visited the Sanmen Nuclear Power Plant in Taizhou, going deep into the main control room of the operating unit and the nuclear island building of the unit under construction, to learn in detail about the operating status and construction progress of the nuclear power units, and to express gratitude to the on-site supervision personnel of the East China Nuclear and Radiation Safety Supervision Station. Ensuring the construction quality of nuclear power units is crucial to enhancing the safety level of nuclear power plants. Huang Runqiu then visited the Jinqimen Nuclear Power Plant in Ningbo, where he inspected the nuclear island foundation area to review the construction progress of the plant and engaged in on-site exchanges with nuclear safety supervision personnel.
2026-08-18
St. Lucie Nuclear Power Plant Unit 1 Manually Shut Down After Three Control Rods Dropped into the Core
According to an event notification submitted to the U.S. Nuclear Regulatory Commission (NRC), Unit 1 of the St. Lucie Nuclear Power Plant, located on Hutchinson Island, Florida, USA, experienced a manual reactor shutdown at 9:47 a.m. Eastern Time on August 13, 2026. At the time of the event, the unit was in Mode 1 and operating at 100% power. The shutdown was caused by three control rods dropping into the reactor core. The U.S. Nuclear Regulatory Commission classified the event as a non-emergency. The licensee stated that the shutdown was completed in accordance with procedures, all systems responded normally after the shutdown, and operators subsequently stabilized the unit in Mode 3, i.e., hot standby condition. Decay heat was removed by diverting steam to the main condenser via turbine bypass valves and the main feedwater system...
2026-08-17
CGN Research Institute Launches "Hehui" I&C Production Line Construction to Advance Domestic Autonomy of High-End Nuclear Power Equipment
Recently, CGN Research Institute held the kickoff meeting for the Hehui I&C production line construction project in Shenzhen, marking new progress in infrastructure and capacity building for the Hehui brand. The project will serve the domestic autonomy of high-end nuclear power equipment, provide support for ensuring the construction progress of nuclear power projects and meeting the safe operation needs of operating units, and help enhance the resilience and competitiveness of China's nuclear power industry chain. The meeting clarified the overall project planning, construction objectives, key milestones, and responsibilities of all parties, established the project management system, and deployed near-term key tasks. The meeting required all parties involved in the construction to increase resource investment, strengthen safety and quality management, strictly enforce technical review, uphold integrity standards, and ensure the production line is commissioned on schedule with high quality...
2026-08-15
Cameco says it can ramp up core uranium asset production when demand recovers
Canadian uranium producer Cameco has said it is well positioned to respond to rising market demand, and will prioritize increasing output from its core assets if demand becomes clearer. Grant Isaac, Cameco's President and Chief Operating Officer, said on a company podcast discussing long-term strategy that Cameco remains committed to supply discipline, focusing on meeting customers' actual needs rather than setting overly ambitious growth expectations in the absence of confirmed demand. Isaac said the company is prepared to increase production from Tier 1 assets such as the McArthur River uranium mine and the Key Lake mill when market demand rises, lifting output from the current approximately 10 million to 11.5 million pounds of U3O8 to 25 million pounds.
2026-08-13
Rosatom Starts Preparations for Long-Lead Equipment Contracts at Primorskaya NPP
The engineering division of Rosatom recently announced that preparations for signing long-lead equipment manufacturing contracts for the Primorskaya Nuclear Power Plant have commenced, covering the reactor building, turbine hall, core catcher, and other major system components. According to the announcement, the scope of contract preparation includes key equipment such as main reactor building equipment, turbine hall equipment, the Automated Process Control System (APCS) for the units, and the core catcher. Long-lead equipment typically has extended manufacturing cycles and represents a critical element that must be secured early in the pre-construction phase of a nuclear power project. Currently, the project is also advancing multiple public tender preparation efforts, including site vertical layout planning,...
2026-08-13
Two Core Indicators of Beijing Huairou High Energy Photon Source Meet Design Requirements
Key progress has been made in the construction of the High Energy Photon Source (HEPS) in Beijing Huairou Science City. The latest tests show that the facility's brightness and storage ring beam orbit stability have both met design requirements, bringing it one step closer to full operation. These two indicators directly determine whether the light source can provide stable, high-quality X-ray beams for scientific users, and are also core parameters in facility performance evaluation. Since the accelerator met acceptance indicators on September 29, 2025, the project team has continuously calibrated equipment and optimized beam conditions during trial operation. After approximately nine months of improvements, the facility's key performance has been significantly enhanced. The storage ring can be understood as a circular track for high-energy electrons, with a total circumference of approximately 1,360 meters. 177...
2026-08-05
Key Breakthroughs Achieved in Development of Core Equipment for BEST Compact Fusion Energy Test Facility
Recently, at a critical juncture in the all-out sprint toward the "double-half" goals, the development of two core components of the compact fusion energy test facility (BEST) main machine equipment—the vacuum vessel and the mid-plane thermal shield—undertaken by Shanghai Electric Nuclear Power Group and manufactured by No.1 Machine Tool Plant, has achieved successive milestone results. Multiple key manufacturing tasks have been successfully completed and delivered upon acceptance, marking that the development of BEST main machine core equipment has fully entered the critical stage of tackling difficulties and accelerating the sprint, laying a solid foundation for high-quality project delivery. As the core key equipment of the compact fusion energy test facility, the BEST vacuum vessel and mid-plane thermal shield feature complex structures, extremely high precision requirements, and difficult manufacturing processes...
2026-08-03
Changwon National University and Vietnam Atomic Energy Institute Join Forces to Promote Korea-Vietnam Nuclear Power Industry Synergy
Changwon National University announced that a delegation from the Vietnam Atomic Energy Institute recently visited the university for in-depth discussions on the development of Vietnam's nuclear power industry and cooperation plans in the field of small modular reactors (SMRs). The delegation was led by Dr. Phan Viet Cuong, Deputy Director of VINATOM, among others. The visit came at a time when the Vietnamese government has been comprehensively promoting the introduction of SMRs as a core national energy strategy since 2024. Through the consultations, both sides reached a consensus on close cooperation to strengthen Vietnam's nuclear power technology competitiveness and foster the next-generation SMR industry. In particular, centered on Changwon National University's "SMR² Platform National Research Institute," customized educational programs will be operated for Vietnamese researchers and students...
2026-08-01
Full-scale Construction Commences for Core Detector Project of Zhangzhou Units 3 & 4
On July 30, the core detector project for Zhangzhou Units 3 & 4, undertaken by China Nuclear Control System Engineering Co., Ltd., commenced smoothly at the Shandong Branch, with experts from the owner and the institute attending the meeting. This project marks the first large-scale application of the Longmou® Core — core detector assembly products, independently developed by China Nuclear Control, on HPR1000 (Hualong One) units. It signifies a new stage of high-quality development in the engineering application of the Longmou® Core series products, represents an important milestone, and will further enhance the autonomy, safety, and international competitiveness of China's nuclear power industry chain. Going forward, China Nuclear Control will continue to uphold the philosophy of "integrating nuclear innovation for efficiency and leading the future with intelligence," persistently deepen technological research in the nuclear detection field, accurately align with user needs, strengthen coordination and collaboration with relevant parties, and safely and efficiently advance project implementation to ensure high-quality product delivery...
2026-08-01
Unit 4 of Leningrad NPP Phase II completes installation of first major equipment
Unit 4 of Russia's Leningrad NPP Phase II recently completed the installation of the core melt catcher vessel. This is the first major equipment of the unit to enter the installation stage, and also the first passive safety system equipment to be installed. The steel structure weighs 157 tonnes, and the installation was carried out using a heavy crawler crane, taking about one work shift of approximately 8 hours, nearly 3 months ahead of the original schedule. Valery Zhemchugov, Acting Director of Leningrad NPP, stated that the installation of the core melt catcher vessel is a key milestone in the construction of Unit 4, a VVER-1200 pressurized water reactor unit, and that the relevant work was completed in accordance with quality requirements, providing more time for subsequent reactor building civil and installation works.
2026-07-31
ZiaCore Microreactor Achieves Criticality in High-Temperature Zero-Power Experiment
Los Alamos National Laboratory announced on July 30 that its ZiaCore microreactor design has completed a high-temperature zero-power criticality proof-of-principle experiment at the National Criticality Experiments Research Center (NCERC) in Nevada, successfully achieving initial criticality. ZiaCore is an advanced nuclear energy microreactor design that uses low-enriched uranium dioxide fuel. The experiment lasted approximately four weeks from April to May this year, advancing the ZiaCore system to zero-power criticality under high-temperature conditions. According to the reactor design and verification process, zero-power criticality experiments can be used to validate the effectiveness of reactor physics designs, providing key benchmark data for subsequent engineering development.
2026-07-31
Hoisting in Place! Global Largest "Artificial Sun" Core Module Installation Progress Exceeds Two-Thirds
On July 28, local time in France, the sixth vacuum vessel module of the International Thermonuclear Experimental Reactor (ITER) tokamak device—Sector Module 1—successfully completed its overall hoisting and precise positioning. Thus, the assembly progress of ITER vacuum vessel modules has exceeded two-thirds. As the general assembly enters a new phase of multi-disciplinary cross-construction, the China Nuclear Engineering Consortium led the coordination of the international team to successfully complete this critical hoisting, laying a solid foundation for subsequent assembly tasks, while fully demonstrating the cross-cultural project management and overall coordination capabilities of the Chinese team in international mega-science projects. The vacuum vessel is a core component of the tokamak device, consisting of nine large sector modules installed and connected sequentially,...
2026-07-30