Search Results

Keyword:1

Curium's Lutetium-177 Injection Approved by FDA for Treatment of Gastroenteropancreatic Neuroendocrine Tumors

Curium's Lutetium-177 Injection Approved by FDA for Treatment of Gastroenteropancreatic Neuroendocrine Tumors

Radiopharmaceutical company Curium recently announced that its developed lutetium-177 (Lu-177) dotatate injection (trade name: Bexlutry) has received formal approval from the U.S. Food and Drug Administration (FDA). The drug is indicated for the treatment of somatostatin receptor-positive adult gastroenteropancreatic neuroendocrine tumors (GEP-NETs). The specific indication scope includes various neuroendocrine tumors occurring in the adult foregut, midgut, and hindgut. Bexlutry is an advanced radioligand therapy whose mechanism of action lies in its ability to specifically bind to somatostatin receptors highly expressed on the surface of such tumors. Through this precise binding, the drug can deliver...

2026-09-16

Germany to provide an additional 1 million euros to help address nuclear safety issues at the Zaporizhzhia NPP

Germany to provide an additional 1 million euros to help address nuclear safety issues at the Zaporizhzhia NPP

Germany will provide an additional 1 million euros to help address nuclear safety issues at the Zaporizhzhia NPP. Recently, according to the German Federal Ministry for the Environment, the German government will provide an additional 1 million euros in aid to improve the safety level of Ukrainian nuclear power plants. Rita Schwarzelühr-Sutter, Parliamentary State Secretary at the German Federal Ministry for the Environment, is expected to formally announce this additional 1 million euros in funding on Tuesday at a meeting of the International Atomic Energy Agency (IAEA) in Vienna. Previously, Germany had cumulatively provided 7.3 million euros in financial support to the IAEA's nuclear safety and security work in Ukraine. Since...

2026-09-16

UK Regulator Initiates Design Assessment of Xe-100 Reactor

UK Regulator Initiates Design Assessment of Xe-100 Reactor

The UK regulator has formally initiated the assessment of the Xe-100 high-temperature gas-cooled reactor design proposed by X-energy, marking an important step for the UK in developing advanced nuclear technology. This decision follows the completion of a review by the UK Department for Energy Security and Net Zero of the application from X-energy UK Holdings Limited. In the same period last year, Centrica signed a joint development agreement with an X-energy subsidiary, planning to deploy Xe-100 reactors in the UK and selecting Hartlepool in northeast England as the preferred site, with the potential to build up to 6 million kilowatts of nuclear power plant capacity in the future. The Generic Design Assessment (GDA) is a comprehensive assessment conducted by the UK Office for Nuclear Regulation, the Environment Agency, and Natural Resources Wales of new reactor designs proposed for deployment in the UK, aimed at ensuring their safety, reliability, and environmental impact meet strict standards. This assessment is independent of site-specific construction applications, and only after passing all stages of assessment can the relevant permits and approvals be obtained.

2026-09-16

Module III of the steel liner of the nuclear island containment vessel for Unit 1 of the Jiangsu Xuwei Nuclear Heating and Power Plant was hoisted into place

Module III of the steel liner of the nuclear island containment vessel for Unit 1 of the Jiangsu Xuwei Nuclear Heating and Power Plant was hoisted into place

On September 15, good news came from the construction milestone of Unit 1 of the Jiangsu Xuwei Nuclear Heating and Power Plant — the first nuclear power unit to start construction during China's 15th Five-Year Plan period — as Module III of the steel liner of the nuclear island containment vessel was successfully hoisted into place, marking another key progress in the project's main construction. Module III hoisted this time adopted a two-layer cylindrical wall panel assembly structure, with a module dead weight of 133 tonnes, an overall lifting weight of 258.52 tonnes, a module body height of 11 meters, and a hoisting elevation of 15.75 meters. As the module landed smoothly in place, the already installed Module I and Module II were connected with Module III as one integrated unit, bringing the cumulative overall height of the containment vessel steel liner cylinder to 31.45 meters. The containment vessel is the core safety barrier of the nuclear island, and the steel liner...

2026-09-16

GE HealthCare Plans $1 Billion Acquisition of Radiopharmaceutical Company Sofie Biosciences

GE HealthCare Plans $1 Billion Acquisition of Radiopharmaceutical Company Sofie Biosciences

According to reports, healthcare giant GE HealthCare is in talks to acquire radiopharmaceutical company Sofie Biosciences for $1 billion. It is understood that this acquisition will be another major business move for GE HealthCare since its spin-off from General Electric Company in 2023. Previously, the company reached an agreement in March of this year to acquire software company Intelerad for $2.3 billion, aiming to enhance its cloud-based enterprise imaging service capabilities. Sofie Biosciences was founded in 2008 and is headquartered in Dulles, Virginia. The company has a well-established radiopharmaceutical production and distribution network and provides contract manufacturing services. In addition, Sofie Biosci...

2026-09-15

IAEA: Global nuclear power installed capacity could reach up to 1,284 GW by 2060

IAEA: Global nuclear power installed capacity could reach up to 1,284 GW by 2060

On September 14, the International Atomic Energy Agency released its latest forecast during the 70th General Conference held in Vienna, raising its global nuclear power growth projection for the sixth consecutive year. The forecast shows that global nuclear power installed capacity could reach up to 1,284 GW by 2060, approximately 3.4 times that of 2025. According to data disclosed by the IAEA, under the high growth scenario, global nuclear power installed capacity will reach 1,045 GW by 2050; even under the low growth scenario, it will reach 696 GW by 2060, nearly double that of 2025. The forecast figures under multiple scenarios jointly point to one trend—the global nuclear power scale is expected to achieve significant expansion in the coming decades. The International Atomic...

2026-09-15

US Fusion Company Commonwealth Fusion Systems Secures $1 Billion Investment from South Korea's Hyundai

US Fusion Company Commonwealth Fusion Systems Secures $1 Billion Investment from South Korea's Hyundai

Recently, the US nuclear fusion company Commonwealth Fusion Systems, backed by Bill Gates, has secured a $1 billion investment from South Korea's Hyundai Motor Group to build its commercial fusion power plant. Chung Ho-eun, Executive Vice President of Hyundai Motor Group, stated that the plan will enable both parties to explore engineering collaboration on a commercial fusion power plant project called ARC. Fusion energy is expected to play an important role in meeting growing global energy demand while supporting a more sustainable future. As of June this year, this hardware solution has received formal academic confirmation of its physical feasibility. Following a peer-reviewed study, CFS validated the ARC des...

2026-09-14

BWXT Awarded $4 Million Conceptual Design Contract for Y-12 Lithium Processing Facility

BWXT Awarded $4 Million Conceptual Design Contract for Y-12 Lithium Processing Facility

Recently, BWX Technologies, Inc. (BWXT), a nuclear technology, nuclear components, and nuclear fuel manufacturing company headquartered in Lynchburg, Virginia, USA, announced that it has been awarded the conceptual design contract for the first module of the first lithium processing facility at the Y-12 National Security Complex by the U.S. Department of Energy National Nuclear Security Administration (DOE/NNSA). It is understood that the Y-12 National Security Complex, located in Oak Ridge, Tennessee, USA, is managed by the National Nuclear Security Administration (NNSA) under the U.S. Department of Energy. Its core business...

2026-09-14

South Korea to Reconsider Accident Management Plans for Four Units at Gori and Hanbit

South Korea to Reconsider Accident Management Plans for Four Units at Gori and Hanbit

On September 11, 2026, the Nuclear Safety and Security Commission of South Korea held its 14th meeting of 2026 to review the accident management plans and operating change license applications submitted by Korea Hydro & Nuclear Power (KHNP) for Gori Nuclear Power Plant Units 3 and 4 and Hanbit Nuclear Power Plant Units 1 and 2. The meeting failed to reach a final conclusion and decided to refer the relevant agenda items to the next meeting for continued deliberation. The accident management plan mainly includes the scope of nuclear power plant accident management, management facilities, management strategies, and training programs. For nuclear power units with long operating lives, approval of this plan is generally regarded as an important prerequisite for subsequent discussions on continued operation licenses....

2026-09-12

Zaporizhzhia Nuclear Power Plant Reportedly Lost Power 10 Times in Three Months

Zaporizhzhia Nuclear Power Plant Reportedly Lost Power 10 Times in Three Months

On September 10, Mikhail Ulyanov, Russia's Permanent Representative to International Organizations in Vienna, said that Ukraine's Zaporizhzhia Nuclear Power Plant (ZNPP) has experienced 10 power outages over the past three months, and the power supply situation remains tense. Ulyanov stated at the International Atomic Energy Agency (IAEA) Board of Governors meeting that over the past three months, multiple facilities at the nuclear power plant have been attacked, including diesel fuel storage facilities, power grid maintenance workshops, and pumping stations. He also said that relevant parties face obstacles in repairing the plant's transmission lines. The Zaporizhzhia Nuclear Power Plant is currently in a cold shutdown state,...

2026-09-11

US ONE Nuclear Plans Up to 1 GW Small Modular Reactor Project in Louisiana

US ONE Nuclear Plans Up to 1 GW Small Modular Reactor Project in Louisiana

ONE Nuclear Energy LLC (ONE Nuclear) announced the launch of its Louisiana project portfolio, with a planned total installed capacity of 5 GW, covering dispatchable generation, grid-scale battery energy storage, data center infrastructure, and advanced nuclear development pathways. The portfolio includes the Cayman Project, the Amberjack Project, and the Barracuda Project. Among them, the one directly related to nuclear power is the Amberjack Project, which aims to build a multi-unit small modular reactor station fleet with an installed capacity of up to 1 GW. ONE Nuclear CEO Richard Taylor stated that the Louisiana project portfolio is designed to meet the growing US electricity demand in different but complementary ways...

2026-09-11

Decommissioning of Unit 1 at Japan's Ikata Nuclear Power Plant Proposed to Move to Phase 2

Decommissioning of Unit 1 at Japan's Ikata Nuclear Power Plant Proposed to Move to Phase 2

On the 11th, Ichiro Ogi, Mayor of Yawatahama City in Ehime Prefecture, Japan, reported to the prefectural government that he has agreed to the decommissioning work of Unit 1 at the Ikata Nuclear Power Plant of Shikoku Electric Power Company entering Phase 2. Ichiro Ogi requested that Shikoku Electric Power thoroughly implement relevant measures during the subsequent decommissioning process to prevent the spread of radioactive materials, control the radiation exposure dose of workers, and protect the surrounding environment of the nuclear power plant. Unit 1 at the Ikata Nuclear Power Plant ceased operation in 2016, and since 2017, decommissioning work has been carried out in four phases, with a planned duration of more than 40 years. Currently, the decommissioning work of this unit is still in Phase 1. According to the safety agreement arrangements, Shikoku Electric Power has submitted a prior consultation application to the Ehime Prefectural Government...

2026-09-11

Turkey and Danish Developer Sign Memorandum of Understanding on Thorium-Based Molten Salt Reactor Research

Turkey and Danish Developer Sign Memorandum of Understanding on Thorium-Based Molten Salt Reactor Research

On September 9, 2026, the Turkish Ministry of Energy stated that the Turkish Energy, Nuclear and Mining Research Institute (TENMAK) has signed a memorandum of understanding with Danish advanced reactor developer Copenhagen Atomics (CA), under which the two parties will conduct collaborative research on the application of thorium as a potential nuclear fuel for molten salt reactors. Tenmak and Copenhagen Atomics signed the memorandum of understanding on September 7. Photo courtesy of the Turkish Ministry of Energy and Natural Resources. The Turkish Ministry of Energy stated that the cooperation aims to advance research in areas related to thorium as a potential fuel for nuclear reactors, with a focus on assessing...

2026-09-10

First concrete poured for turbine building foundation of Unit 3 VVER-1200 at Leningrad NPP Phase II

First concrete poured for turbine building foundation of Unit 3 VVER-1200 at Leningrad NPP Phase II

On September 9, 2026, concrete pouring began for the foundation of the turbine building of Unit 3 VVER-1200 at Leningrad NPP Phase II in Russia. Construction workers have completed the pouring of the central section of the future foundation, with concrete consumption approaching 5,000 cubic meters. This pour is the first stage of construction of the foundation structure for this building. According to the plan, the contractor will use nearly 5,000 tonnes of rebar and more than 20,000 cubic meters of high-strength concrete to build a monolithic foundation slab 2.5 meters high and more than 8,000 square meters in area. The related operations are currently being carried out simultaneously in 7 construction zones. Konstantin Khudyakov, head of the Leningrad NPP project at TITAN-2 Holding (TITAN-2), said that the foundation construction of the turbine building places high demands on concrete quality, pouring technology and curing conditions, especially in the first few days after pouring, when it is necessary to focus on controlling on-site temperature and humidity and preventing mechanical damage. After the concrete reaches design strength, the contractor will, together with the owner, use non-destructive testing methods to inspect the structure, including ultrasonic testing; at the same time, specimens made from the same batch of concrete will also be subjected to compressive tests on a hydraulic press to confirm that the foundation is capable of bearing the loads of walls, floors, piping and large operating equipment.

2026-09-10

Greece Establishes Committee to Study Inclusion of Nuclear Energy in Long-Term Energy Planning

Greece Establishes Committee to Study Inclusion of Nuclear Energy in Long-Term Energy Planning

On September 9, 2026, the Greek government published a decision in the Official Gazette establishing a government committee to study the possibility of including nuclear energy in the country's long-term energy planning. According to the document, the committee will work in accordance with relevant guidelines of the International Atomic Energy Agency (IAEA) as Greece's Nuclear Energy Programme Implementing Organisation (NEPIO), responsible for organizing and managing the first phase of the IAEA Milestones Approach. This phase is the exploratory stage set by the IAEA for countries considering the development of nuclear power. The IAEA Milestones Approach is a framework guideline for countries interested in developing nuclear power, divided into three phases and covering 19 infrastructure issues, with the related work to be completed before the commissioning of the first nuclear power plant.

2026-09-10

Baidu
map