Search Results
Keyword:7
Serbia Launches Nuclear Program: Experts to Train in France for 17 Months, First Nuclear Power Plant Expected by 2040
The nuclear cooperation agreement signed between Serbia and France officially launched the first phase of the country's nuclear energy program on July 29. Under the agreement, Serbian experts will travel to France over the next 17 months for training, seminars, and professional visits to acquire the new knowledge and experience needed to advance the nuclear program. Radoš Popadić, Assistant Minister at Serbia's Ministry of Mining and Energy, stated that nuclear energy could become a realistic and viable solution within Serbia's energy mix. The primary task of the first phase is to assess existing capabilities and identify what additional resources are needed as the process moves forward. According to the plan, Serbia needs to strategically...
2026-08-03
Japanese Poll: 76% of Respondents Support Maintaining the "Three Non-Nuclear Principles"
The Tokyo Shimbun, citing a national poll conducted by the Kyodo News-affiliated survey organization from June to July among 3,000 people aged 18 and above, reported that 76% of Japanese support maintaining the Three Non-Nuclear Principles of not manufacturing, not possessing, and not allowing the introduction of nuclear weapons; 77% oppose nuclear-sharing arrangements (i.e., the U.S. stationing nuclear weapons in Japan and operating them jointly). Given that Japan is the only country to have suffered atomic bombing in war, the results highlight strong anti-nuclear sentiment, while debate over whether to revise the principles is intensifying. Support for Japan joining the Treaty on the Prohibition of Nuclear Weapons before the first review conference in November stands at 55%, down 5 percentage points from the previous year; opponents account for 42%, of whom 56% believe that joining would not lead to nuclear disarmament. Regarding recent U.S. actions...
2026-08-03
US FDA Approves Pluvicto Expanded Indication for Treatment of PSMA-Positive Metastatic Hormone-Sensitive Prostate Cancer
On July 31, 2026, Novartis announced that the U.S. Food and Drug Administration (FDA) has approved Pluvicto® (lutetium Lu 177 vipivotide tetraxetan) in combination with an androgen receptor pathway inhibitor (ARPI) for the treatment of patients with prostate-specific membrane antigen (PSMA)-positive metastatic androgen pathway modulation-naive/sensitive prostate cancer. This disease is commonly referred to as metastatic hormone-sensitive prostate cancer (mHSPC). The approval is based on results from the Phase III PSMAddition trial. The study showed that compared with standard of care alone, namely ARPI combined with androgen deprivation therapy (ADT), Pluvicto plus standard of care reduced the risk of disease progression or death by...
2026-08-03
Buried Cesium-137 Sealed Source Discovered by Texas Patrol Officer Near Roadside in Midland County
According to the Texas Department of Public Safety, a corporal with the department recently discovered a buried cesium-137 sealed radioactive source with an activity of 100 millicuries during a routine patrol near a roadway in Midland County. The incident resulted in no injuries or radiation contamination, and public safety was not threatened. On July 24 local time, the corporal, assigned to the department's Radioactive/Nuclear Threat Detection Section, was patrolling near South County Road 1210 when the vehicle-mounted radiation detection system activated. He then used other detection equipment to survey the surrounding area and traced the radiation signal to an underground location. To ensure safe disposal, he requested assistance from local, state, and federal...
2026-08-02
U.S. Team Traces Source of Anomalous Gamma Rays from Zinc-70, Nuclear Magnetic Transitions May Improve Models of Heavy Element Formation
An international research team led by scientists from the Facility for Rare Isotope Beams (FRIB) at Michigan State University has recently identified the source of the large number of low-energy gamma rays emitted by zinc-70 nuclei. The study suggests that magnetic transitions occurring within the nucleus are the key reason for this anomalous signal enhancement. The findings were published in the journal Nature under the title "Magnetic character of the low-energy enhancement in 70Zn." Gamma rays are electromagnetic radiation released when excited atomic nuclei transition to lower, more stable energy levels. For a long time, scientists have observed an anomalous increase in the number of low-energy gamma rays in some atomic nuclei, known as the low-energy enhancement (LEE), but its physical mechanism had remained unclear...
2026-08-02
South Korea Plans to Establish Radioisotope Commercialization Company, Targeting Trial Production in 2028
According to sources inside and outside the South Korean government on July 31, Korea Hydro & Nuclear Power (KHNP) and relevant departments including the Ministry of Economy and Finance plan to discuss the establishment of a special purpose company (SPC) for radioisotope commercialization. The company is proposed to be set up as a subsidiary of KHNP, with domestic private enterprises, including pharmaceutical companies, expected to participate in investment. Under the current plan, the South Korean government will determine the specific investment structure and business plan through inter-departmental consultations this year, and strive to complete the company's establishment by 2027. Subsequently, the relevant parties will push forward facility construction to produce radioisotopes using nuclear power plants, with the goal of commencing trial production in 2028. Radioisot...
2026-08-01
Japan's Fukushima Daiichi Nuclear Power Station launches 22nd release of radioactive wastewater into the ocean, approximately 7,800 tons this time
On the morning of July 30, 2026, Tokyo Electric Power Company (TEPCO) initiated a new round of nuclear-contaminated water discharge into the ocean at the Fukushima Daiichi Nuclear Power Station. This marks the 4th release within 2026 and the 22nd since the discharge plan began in August 2023. According to data released by TEPCO, this discharge is expected to continue until the 17th of next month, with a total volume of approximately 7,800 tons. The total amount of radioactive substance tritium contained therein is as high as approximately 1.3 trillion becquerels. Prior to this, Japan had conducted a total of 21 rounds of radioactive wastewater discharge by the 24th of this month, with a cumulative discharge volume reaching approximately 165,000 tons. This action continues to draw attention and concern from neighboring countries and the international community. This time...
2026-07-31
QST completes first gyrotron 170 GHz microwave output test at ITER site
The National Institutes for Quantum Science and Technology (QST) of Japan announced on July 31 that it has completed the integration and operational testing of the first gyrotron system at the International Thermonuclear Experimental Reactor (ITER) site in southern France, successfully producing 170 GHz microwave output. This system is used for ITER plasma generation and heating, and is one of the key devices for ITER's plan to commence operations in 2034. The core equipment of this test is the gyrotron, a high-power microwave source. Gyrotron operation requires the coordinated work of peripheral equipment such as power supplies, superconducting coils, and cooling systems. QST previously completed performance testing of eight ITER gyrotron systems at the gyrotron test facility of the Naka Fusion Institute in Japan, and transported components including gyrotrons, superconducting coils, and quasi-optical matching units to the ITER site. Over the past three years, QST has advanced system installation, commissioning, and operational preparation at the site.
2026-07-31
Restart of Tomari Nuclear Power Plant Unit 3 Delayed to After End of 2027
Hokkaido Electric Power Co. announced on July 30 that the restart of Unit 3 at the Tomari Nuclear Power Plant will be significantly delayed compared to earlier expectations, with the earliest possible date being the end of 2027 or later. Previously, the company had set a target of restarting as early as possible within 2027, but due to delays in the seawall construction project and the fact that the Nuclear Regulation Authority (NRA) has not yet completed its review of the relevant design and construction plans, the timeline for the unit's return to operation remains uncertain. Hokkaido Electric Power President Susumu Saito stated at a press conference that the seawall at the Tomari plant was originally scheduled for completion in the spring of 2027, but is now expected to be finished by mid-August 2027 due to additional work such as seismic reinforcement of the wharf and liquefaction countermeasures...
2026-07-31
The 7th National Nuclear Regulatory Conference of Vietnam Convened: Improving the Legal Framework to Serve the National Nuclear Program and Sustainable Development
The 7th National Nuclear Regulatory Conference of Vietnam was held in Quang Ninh Province, with the theme of national management of radiation and nuclear safety serving socio-economic development. The conference brought together leaders from the government, ministries, and industry sectors, local officials, as well as over 400 delegates and experts from international organizations including the International Atomic Energy Agency (IAEA). This conference aimed to comprehensively assess the achievements of national governance in the field of radiation and nuclear safety over the past period, unify directions, clarify tasks, and formulate key solutions for development from 2026 to 2035. The conference took place at an important time when Vietnam's nuclear program is being restarted, supporting the peaceful use of atomic energy, ensuring radiation and nuclear safety, and strengthening national scientific and technological capabilities...
2026-07-30
CEO of Atomic Energy of Canada Limited to Step Down After Term Ends in 2027
Atomic Energy of Canada Limited (AECL) announced on July 28 that, after consultation with the Chair of the Board, the company's President and Chief Executive Officer, Fred Dermarkar, has informed the Board that he will not seek reappointment after his term ends on February 7, 2027. AECL stated that Dermarkar believes that as the company enters a new and important phase of development, now is the appropriate time to initiate a leadership transition. He will continue to serve until the end of his term to ensure management continuity while the company advances its key strategic priorities and to support a smooth handover to new leadership. This personnel announcement comes at a time of active development in Canada's nuclear energy industry. Previously, the Canadian government...
2026-07-29
EU Releases 2026–2027 Nuclear Research and Training Work Programme: Focusing on Safety, Innovation, and Capacity Building
Recently, the European Commission officially released the "2026-2027 European Atomic Energy Community (Euratom) Research and Training Work Programme" (hereinafter referred to as the Euratom Programme). This programme is a continuation and deepening of the Euratom work plan for 2021-2025, setting out the strategic directions, priorities, and funding actions for nuclear research in the next two years. This article systematically reviews the core content of the Euratom Programme, providing a detailed introduction from multiple dimensions, including the strategic framework, annual guidelines, specific actions in various research areas, other supporting measures, and budget arrangements, aiming to offer a comprehensive reference for domestic nuclear safety regulation and technical support work. Overall Strategy...
2026-07-29
US-based Lance uranium project withdraws 2026 production guidance; 2027 target remains unchanged.
Peninsula Energy has announced the withdrawal of its 2026 production guidance for the Lance uranium project in Wyoming, USA, while reaffirming its 2027 production target of 500,000 to 600,000 pounds of U3O8 (equivalent to 192–231 tonnes of urani
2026-07-27
CNNC 272 Uranium Industry and Fuqing Nuclear Power Sign Partnership Agreement to Enhance Safety, Quality, and Environmental Management
On July 24, Song Lin, Party Secretary and Chairman of Fuqing Nuclear Power, led a delegation to CNNC 272 Uranium Industry for a fact-finding visit and exchange. The visit included a symposium on safety and environmental protection and the signing of a &qu
2026-07-27
Tianwan Unit 7 and Xudapu Unit 3 are expected to enter the commissioning phase within a few weeks.
Likhachev, Director General of Rosatom, stated on July 24 that Unit 7 of the Tianwan Nuclear Power Plant and Unit 3 of the Xudapu Nuclear Power Plant in China are expected to enter the commissioning phase within the coming weeks.Responding to questions fr
2026-07-27